Tuesday, September 23, 2008

Underground Completed!

The underground plumbing and HVAC has been completed. We are now in the process of grading and preparing the slab for concrete. This preparation should take another 4 working days. In less than 2 weeks we should have the floor all poured to get ready for the framing stage.

Monday, September 15, 2008

Footings Poured!

The footings have been prepped, inspected and poured. The slab is now to be prepared and the underground work (electrical, plumbing, heat and air) are underway.

Tuesday, September 9, 2008

Landscaping Adjustments Next Door Completed

With the permission of the ACC and the home owner next door we had some rocks, trees and shrubbery removed that was encroaching to this lot and was obstructing the construction pad area. This has been completed and the footings are now being dug and prepped to be poured.

Thursday, September 4, 2008

Permit Pulled!

The building permit for this wonderful home has been officially pulled. A temperary power pull is being set and a site inspection from the City and the ACC are underway.